Trinity County
Unincorporated Trinity County ADU rules
Research summary of what we found for Unincorporated Trinity County in Trinity County. Not a determination for a specific lot.
City or county ADU page
Unincorporated Trinity County ADU page
Check any California address for freeHow big can an ADU be in Trinity County?
Maximum size
A detached ADU may be up to 1,200 sq ft, and at least 150 sq ft or the building code's minimum for a dwelling. An attached ADU may add no more than 50% of the main home's living area, up to 1,200 sq ft. The County's rules may not block an 800 sq ft unit with 4 ft setbacks. State law also bars local size limits below 850 sq ft, or 1,000 sq ft with more than one bedroom (Gov. Code § 66321(b)(2)).
Source: Trinity County Ordinance 315-860 (adopted December 16, 2025), amending Zoning Code Section 17.30.040(C) Accessory Dwelling Units, § 17.30.040(C)(4)(b)-(c), (C)(4)(d)(i), accessed 2026-11-01.
ADU setbacks in Trinity County
Setbacks
The code sets a 4 ft setback for ADUs and says setbacks cannot block a unit of at least 800 sq ft. It does not say which lot lines the 4 ft figure covers. ADUs must also meet the state fire safe rules for new structures (Public Resources Code §§ 4290 and 4291).
Source: Trinity County Ordinance 315-860 (adopted December 16, 2025), amending Zoning Code Section 17.30.040(C) Accessory Dwelling Units, § 17.30.040(C)(4)(d)(i), (C)(4)(j), accessed 2026-11-01.
What we found for Trinity County
What we have for this place. Where a local figure is stricter than the California state baseline, both are shown.
Local ADU rules
The County's ADU rules are in Zoning Code Section 17.30.040(C), as rewritten by Ordinance 315-860, adopted December 16, 2025 and in effect 30 days later. The County posts the signed ordinance in marked-up form (struck and added text) and a clean copy of the new text. ADU and JADU applications are reviewed ministerially, without a hearing, and the County acts within 60 days of a complete application. A demolition permit for a detached garage being replaced by an ADU is issued with the ADU permit.
Source: Trinity County Ordinance 315-860 (adopted December 16, 2025), amending Zoning Code Section 17.30.040(C) Accessory Dwelling Units, § 17.30.040(C)(3)(a)-(d); Section IV, accessed 2026-11-01.
ADU types and how many
ADUs are allowed by right in all zones that allow single-family or multifamily homes. On a single-family lot under 1 acre, up to two detached ADUs and one JADU are allowed; on 1 to 2 acres, up to three detached ADUs and one JADU; over 2 acres, up to four detached ADUs and one JADU. For these extra ADUs you must show public sewer or enough septic capacity. On a lot with an existing multifamily building: ADUs in non-livable space (such as a leasing office) up to 25% of the existing units, and at least one, plus up to eight detached ADUs, not more than the number of existing units. A lot with a planned multifamily building may have up to two detached ADUs. In multifamily zones, up to five more ADUs are allowed if half of all units are kept for lower income households for at least three years.
Source: Trinity County Ordinance 315-860 (adopted December 16, 2025), amending Zoning Code Section 17.30.040(C) Accessory Dwelling Units, § 17.30.040(C)(4)(a), (C)(4)(l), (C)(5), accessed 2026-11-01.
Height
An ADU may be up to 25 ft tall. The code also limits an ADU to the height of the main home (with a 20 ft house, a 20 ft ADU), where that does not go below state law. If a two-story detached ADU fits the state height allowances and the building code, zoning that limits the main home to one story cannot be used to deny it.
Source: Trinity County Ordinance 315-860 (adopted December 16, 2025), amending Zoning Code Section 17.30.040(C) Accessory Dwelling Units, § 17.30.040(C)(4)(d)(ii), accessed 2026-11-01.
Parking
One parking space per ADU, in addition to the main home's parking. No space is needed within a half mile of a public transit stop, in a historic district, for an ADU inside the existing home or an existing accessory structure, where on-street parking permits are required but not offered to the ADU occupant, within one block of a car share vehicle, or when the ADU is applied for together with a new home on the lot.
Source: Trinity County Ordinance 315-860 (adopted December 16, 2025), amending Zoning Code Section 17.30.040(C) Accessory Dwelling Units, § 17.30.040(C)(4)(e), accessed 2026-11-01.
Junior ADUs
The code sets no size or design standards of its own for JADUs; state law (Gov. Code §§ 66333 to 66339) applies, under which a JADU is up to 500 sq ft and inside the home. JADU applications are reviewed ministerially within 60 days, and one JADU is allowed alongside the detached ADUs listed above.
Source: Trinity County Ordinance 315-860 (adopted December 16, 2025), amending Zoning Code Section 17.30.040(C) Accessory Dwelling Units, § 17.30.040(C)(3)(a)-(b), (C)(5)(b), accessed 2026-11-01.
Sewer, water, fees and rental
A new ADU needs its own sewer hookup, unless it is inside the existing home or an existing accessory structure. Outside a sewer district, a detached ADU needs its own septic system, and Environmental Health checks the existing septic system for an attached ADU. The ADU and main home may share a water supply if it gives at least 3 gallons per minute per unit plus fire protection water. ADUs are not counted as new residential uses for utility connection fees. ADUs may not be rented for less than 30 days.
Source: Trinity County Ordinance 315-860 (adopted December 16, 2025), amending Zoning Code Section 17.30.040(C) Accessory Dwelling Units, § 17.30.040(C)(4)(f)-(h), (C)(4)(k), accessed 2026-11-01.
Movable tiny homes
Separate from the ADU rules, Chapter 15.27 (Ordinance 1375, adopted June 17, 2025) allows a movable tiny home up to 400 sq ft and one story (lofts allowed) by right in zones that allow a single-family home by right. It needs a building permit, zoning clearance, its own address, fire safe features and water and septic sign-off, must look like a house with wheels hidden, and must meet the zone's setbacks.
Source: Trinity County Ordinance 1375, Chapter 15.27 Movable Tiny Homes, §§ 15.27.040, 15.27.050, accessed 2026-11-01.
California state rules
The statewide baseline recorded from state law and the HCD ADU Handbook.
Detached size cap described in state law
1,200 sq ft. From Government Code section 66314.
Source: California Government Code section 66314, 66314, accessed 2026-10-16.
Side and rear setback cap for a new ADU
4 ft. From Government Code section 66314, which describes a cap on side and rear setbacks for a new ADU.
Source: California Government Code section 66314, 66314, accessed 2026-10-16.
Setback for a conversion of an existing structure
No additional setback, from Government Code section 66314 for a conversion of an existing structure.
Source: California Government Code section 66314, 66314, accessed 2026-10-16.
Minimum lot size
A city may not impose a minimum lot size for an ADU, from Government Code section 66314.
Source: California Government Code section 66314, 66314, accessed 2026-10-16.
Minimum unit the handbook says cities must allow
At least an 800 sq ft ADU with 4 ft side and rear setbacks. The HCD ADU Handbook (updated March 2026) describes this under section 66321(b)(3).
Source: HCD ADU Handbook, 66321(b)(3); handbook updated March 2026, accessed 2026-10-16.
Detached height described in the handbook
16 ft, or 18 ft or 20 ft in some cases. The HCD ADU Handbook (updated March 2026) describes this under section 66321(b)(4).
Source: HCD ADU Handbook, 66321(b)(4); handbook updated March 2026, accessed 2026-10-16.
Permit decision deadline
60 days. From Government Code section 66317(a)(3): the permitting agency must decide on (approve or deny) a completed ADU application within 60 days when an existing single-family or multifamily dwelling is on the lot. Section 66317(a)(1) says the application is considered ministerially, without discretionary review or a hearing.
Source: California Government Code section 66317, 66317(a)(1), (a)(3), accessed 2026-10-17.
Owner-occupancy requirement
None. From Government Code section 66315: a local agency may not impose an owner-occupancy requirement on an ADU. It may require that the property be used for rentals of terms 30 days or longer. The HCD ADU Handbook (updated March 2026) describes the same rule.
Source: California Government Code section 66315, 66315; HCD ADU Handbook updated March 2026, accessed 2026-10-17.
Parking near public transit
No parking standards within one-half mile walking distance of public transit. From Government Code section 66322(a)(1). Section 66322(a) lists several other cases where parking standards may not be imposed.
Source: California Government Code section 66322, 66322(a), accessed 2026-10-17.
Ministerial categories
The HCD ADU Handbook (updated March 2026) states that Government Code section 66323 sets four ministerial categories. What we have does not restate those four categories.
Source: HCD ADU Handbook, 66323; handbook updated March 2026, accessed 2026-10-16.
Fire Hazard Severity Zones
If your lot is in a Fire Hazard Severity Zone, the CAL FIRE Office of the State Fire Marshal says in Information Bulletin 25-004 (issued March 3, 2025): “Fire Hazard Severity Zones (FHSZs) should not restrict the development of Accessory Dwelling Units (ADUs). However, additional building standards may be necessary, including but not limited to California Fire Code Chapter 49 and California Building Code Chapter 7A.” State ADU law does not itself bar an ADU there. A city or county may still apply its building code, including wildfire-resistant construction (Gov. Code 66314(d)(8)); require side and rear setbacks “sufficient for fire and safety” for a unit converted under 66323(a)(1); and decline parking in setbacks on specific fire and life safety findings (66314(d)(10)(B)). It may also consider public safety when it designates where ADUs may be permitted (66314(a)). Sprinklers can't be required in an ADU or JADU if the primary residence doesn't need them (66314(d)(12), 66323(d)). Some cities and counties still apply their own fire-zone limits. Where this summary has one, it is listed with the local rules. This summary does not look up your lot. Check the CAL FIRE Fire Hazard Severity Zone map viewer linked from the State Fire Marshal's Fire Hazard Severity Zones page: https://experience.arcgis.com/experience/5065c998b4b0462f9ec3c6c226c610a9
Source: CAL FIRE Office of the State Fire Marshal Information Bulletin 25-004, page 4, issued March 3, 2025; Gov. Code 66314, 66323, accessed 2026-10-20.
State baseline on the directory → · State ADU rules on the homepage →
Can I build an ADU in Unincorporated Trinity County?
State law sets a baseline for ADUs in Unincorporated Trinity County, and what we found locally is listed on this page. Whether a specific lot can add an ADU depends on zoning, utilities, and other site facts this page does not measure. Confirm with the County of Trinity planning department, or run a free address summary.