Alameda County

Dublin ADU rules

Research summary of local ADU rules on file for Dublin in Alameda County. Not a determination for a specific lot.

City or county ADU page

Dublin ADU page

Check any California address for free

Dublin rules on file

Local rules recorded in this project for this jurisdiction. Where a city figure on file is stricter than the state baseline on file, both are shown.

Free City prototype plans

Eight plans by RRM Design Group: five detached ADUs (384, 508, 518, 763 and 909 sq ft) and three garage conversions (224, 428 and 649 sq ft), in Spanish, Traditional or Modern styles. The City provides floor plans, elevations, electrical and plumbing plans, structural calculations and preliminary energy calculations free of charge.

Source: City of Dublin, Prototype Plans page, Prototype Plans, accessed 2026-10-23.

How to get a prototype plan

Email the Planning Division at planningpermits@dublin.ca.gov with the property address and plan number. You still complete the items on the ADU Prototype Plans Checklist, such as a site plan.

Source: City of Dublin, Prototype Plans page, Prototype Plans, accessed 2026-10-23.

Building permit fee waiver

Building permit fees are waived for ADUs applied for between January 1, 2022 and December 31, 2026 that are under 750 sq ft, or 750 sq ft or larger and deed-restricted as lower-income units for 55 years. The City puts the savings at about $2,500–$6,000 depending on valuation.

Source: City of Dublin, ADU Fees & Waivers page, Permit Fee Waivers, accessed 2026-10-23.

Impact fees

ADUs under 750 sq ft pay no impact fees; larger ADUs pay fees in proportion to the main home.

Source: City of Dublin, ADU Fees & Waivers page, Impact Fee Waivers, accessed 2026-10-23.

Building permits

See the City's Building Permit page or call the Building and Safety Division at (925) 833-6620.

Source: City of Dublin, Accessory Dwelling Units page, Building Permits, accessed 2026-10-23.

California state rules on file

The statewide baseline recorded from state law and the HCD ADU Handbook.

Detached size cap described in state law

1,200 sq ft. Recorded in this rules file from Government Code section 66314.

Source: California Government Code section 66314, 66314, accessed 2026-10-16.

Side and rear setback cap for a new ADU

4 ft. Recorded in this rules file from Government Code section 66314, which describes a cap on side and rear setbacks for a new ADU.

Source: California Government Code section 66314, 66314, accessed 2026-10-16.

Setback for a conversion of an existing structure

No additional setback, as recorded in this rules file from Government Code section 66314 for a conversion of an existing structure.

Source: California Government Code section 66314, 66314, accessed 2026-10-16.

Minimum lot size

A city may not impose a minimum lot size for an ADU, as recorded in this rules file from Government Code section 66314.

Source: California Government Code section 66314, 66314, accessed 2026-10-16.

Minimum unit the handbook says cities must allow

At least an 800 sq ft ADU with 4 ft side and rear setbacks. The HCD ADU Handbook (updated March 2026) describes this under section 66321(b)(3).

Source: HCD ADU Handbook, 66321(b)(3); handbook updated March 2026, accessed 2026-10-16.

Detached height described in the handbook

16 ft, or 18 ft or 20 ft in some cases. The HCD ADU Handbook (updated March 2026) describes this under section 66321(b)(4).

Source: HCD ADU Handbook, 66321(b)(4); handbook updated March 2026, accessed 2026-10-16.

Permit decision deadline

60 days. Recorded in this rules file from Government Code section 66317(a)(3): the permitting agency must decide on (approve or deny) a completed ADU application within 60 days when an existing single-family or multifamily dwelling is on the lot. Section 66317(a)(1) says the application is considered ministerially, without discretionary review or a hearing.

Source: California Government Code section 66317, 66317(a)(1), (a)(3), accessed 2026-10-17.

Owner-occupancy requirement

None. Recorded in this rules file from Government Code section 66315: a local agency may not impose an owner-occupancy requirement on an ADU. It may require that the property be used for rentals of terms 30 days or longer. The HCD ADU Handbook (updated March 2026) describes the same rule.

Source: California Government Code section 66315, 66315; HCD ADU Handbook updated March 2026, accessed 2026-10-17.

Parking near public transit

No parking standards within one-half mile walking distance of public transit. Recorded in this rules file from Government Code section 66322(a)(1). Section 66322(a) lists several other cases where parking standards may not be imposed.

Source: California Government Code section 66322, 66322(a), accessed 2026-10-17.

Ministerial categories

The HCD ADU Handbook (updated March 2026) states that Government Code section 66323 sets four ministerial categories. This rules file does not restate those four categories.

Source: HCD ADU Handbook, 66323; handbook updated March 2026, accessed 2026-10-16.

Fire Hazard Severity Zones

If your lot is in a Fire Hazard Severity Zone, the CAL FIRE Office of the State Fire Marshal says in Information Bulletin 25-004 (issued March 3, 2025): “Fire Hazard Severity Zones (FHSZs) should not restrict the development of Accessory Dwelling Units (ADUs). However, additional building standards may be necessary, including but not limited to California Fire Code Chapter 49 and California Building Code Chapter 7A.” State ADU law does not itself bar an ADU there. A city or county may still apply its building code, including wildfire-resistant construction (Gov. Code 66314(d)(8)); require side and rear setbacks “sufficient for fire and safety” for a unit converted under 66323(a)(1); and decline parking in setbacks on specific fire and life safety findings (66314(d)(10)(B)). It may also consider public safety when it designates where ADUs may be permitted (66314(a)). Sprinklers can't be required in an ADU or JADU if the primary residence doesn't need them (66314(d)(12), 66323(d)). Some cities and counties still apply their own fire-zone limits. Where this summary has one, it is listed with the local rules. This summary does not look up your lot. Check the CAL FIRE Fire Hazard Severity Zone map viewer linked from the State Fire Marshal's Fire Hazard Severity Zones page: https://experience.arcgis.com/experience/5065c998b4b0462f9ec3c6c226c610a9

Source: CAL FIRE Office of the State Fire Marshal Information Bulletin 25-004, page 4, issued March 3, 2025; Gov. Code 66314, 66323, accessed 2026-10-20.

State baseline on the directory → · State ADU rules on the homepage →

Can I build an ADU in Dublin?

State law sets a baseline for ADUs in Dublin, and the local standards on file are listed on this page. Whether a specific lot can add an ADU depends on zoning, utilities, and other site facts this page does not measure. Confirm with City of Dublin Planning Division, or run a free address summary.

Check any California address for free